Consultation & Survey
Every project begins with an initial consultation and floor survey. We assess the condition of the existing subfloor, measure the space accurately and discuss suitable LVT products, patterns and layouts. This allows us to recommend the most appropriate installation approach for your home.
FLOORING REMOVAL
Where required, existing flooring such as laminate, vinyl, carpet or engineered wood can be carefully removed. Adhesives and residues are cleared to ensure a clean surface ready for preparation.
Typical removals include:
• Carpet and underlay
• Laminate flooring
• Existing vinyl flooring
• Adhesive residue removal
SUBFLOOR PREPERATION
This is one of the most important parts of a professional installation.
A properly prepared subfloor ensures the final flooring performs correctly and maintains its appearance over time. We carry out comprehensive subfloor preparation to create a smooth, stable and level surface before installation begins.
Preparation may include:
• Floor levelling compounds
• Smoothing compounds
• Subfloor repairs
• Concrete preparation
MOISTURE PROTECTION
Where moisture is present within the subfloor, damp proof membranes can be applied to protect the flooring installation and ensure long-term durability.
Services may include:
• Moisture testing
• Damp proof membrane application
• Subfloor sealing systems
LVT Flooring Installation
With the preparation complete, the LVT flooring is installed with precision and attention to detail. We specialise in premium patterned installations including herringbone, chevron and plank layouts.
Installation services include:
• Herringbone LVT installation
• Chevron pattern installation
• Straight plank layouts
• Feature borders and design details
